1-7-2022—By the grace of the Almighty, Armas Company, through its factory, Maromix, has been able to complete the second phase of the Al-Munira housing project of Saudi Aramco. The first stage was 90 rooms, and the second stage consists of 145 rooms. All woodwork and furniture for all these rooms have been manufactured and installed. The work involves fabrication and installation of kitchens with dining tables attached, TV stands, wardrobes, study desks, back beds, bedside tables, as well as washbasins.
The implementation of the second three times faster than the first stage. This demonstrates the company’s distinctive and advanced capabilities through using the latest and most advanced machines, production lines, manufacturing, along with qualified and trained manpower to utilize modern tools and production methods.
As far as the remaining 235 rooms are concerned, we anticipate that the next phase will be implemented at the fastest rate possible.